Aeropuerto Internacional Ministro Pistarini
Type: Special Projects
Commitent: AA2000
Project:
Start Date: 2019
End Date: 2020
Surface: 60.000m2
Aeropuerto Internacional Ministro Pistarini
The project include the construction of a new covered multilevel parking lot for the air terminal. The building consists of 2 upper levels, the access level on the ground floor and two basements, linked to the future terminal buildings. The parking lot has a pedestrian connection in the second subsoil that allows access to the New Departures Terminal, access is direct from the parking lot to the terminal. Complementing the vertical pedestrian link between levels, 6 vertical cores were built consisting of elevator batteries in pairs per core, escape stairs, payment machines and collection booths on the ground floor, where the toilets are found. Regarding general services, the new building has an electrical installation, weak currents, a sanitary installation, fire detection and extinction, and air extraction and injection on the two lower levels.